Technical Mode:Line Back end:ACR200 Back end Mode:1x2, multi-bank Procedures:Track Receiver:Q Switching Scheme:FreqSwitch
|
Proposal Information PI:Turner Bands: Q Back ends: S Support Person:
|
Checkout Notes Need good baselines. Single-bank not practical. Waiting on Q band
|
Technical Mode:Line Back end:ACR800 Back end Mode:4x2, multi-bank Procedures:DualBeamSwitch Receiver:Q Switching Scheme:BeamSw
|
Proposal Information PI:Hollis Bands: Q Back ends: S Support Person:
|
Checkout Notes Single-bank mode not practical. Need good baselines. Waiting on Q band
|
Technical Mode:Line Back end:ACR800 Back end Mode:4x2, multi-bank Procedures:DualBeamSwitch Receiver:K Switching Scheme:BeamSw
|
Proposal Information PI:Eales Bands: K Back ends: S Support Person:
|
Checkout Notes Single-bank mode not practical. Need excellent baselines.
|
Technical Mode:Line Back end:ACR800 Back end Mode:1x2, two-bank Procedures:DualBeamSwitch Receiver:Q Switching Scheme:BeamSw
|
Proposal Information PI:Combes Bands: Q Back ends: S Support Person:
|
Checkout Notes Single-bank mode probably requires twice the telescope time. Requires good baselines. Waiting on Q band
|
Technical Mode:Line Back end:ACR800 Back end Mode:4x2, multi-bank Procedures:DualBeamSwitch Receiver:KU Switching Scheme:BeamSw
|
Proposal Information PI:Yun Bands: KU Back ends: S Support Person: F. Ghigo
|
Checkout Notes
|
Spectrometer (Autocorrelator) Notes Preferred: 1W2-001-800; 1W2-123-800; 1W2-245-800; 1W2-367-800
|
Technical Mode:Line Back end:ACR800 Back end Mode:2x2, multi-bank Procedures:DualBeamSwitch Receiver:Ku Switching Scheme:BeamSw
|
Proposal Information PI:Barvanis Bands: U Back ends: S Support Person: R. Maddalena
|
Checkout Notes Long integrations, wide lines require good baselines. Assuming some aspects of the requested ACR mode (two 800 MHz in series).
09/12/02 D. Balser
The spectrometer modes have not been checked out by engineering. The
preferred spectrometer mode requires multiple banks which are not yet
available. Alternative modes have not yet been discussed but since
they are performing a search all 8 samplers are probably required. The
spectral baselines will probably be important. They expect linewidths
of 100's km/s (5 MHz).
o Observational Setup: - Front End: Ku-band - Back End: Spectrometer
1. Preferred mode Samplers: 8 BW: 800 MHz Level: 3 Banks: 4 (2048 lags; Resolution = 391 kHz) Mode: 1W2-001-800; 1W2-123-800; 1W2-245-800; 1W2-367-800
Notes: (i) Multiple banks cause M&C reliability problems.
- Observing Mode: Double Beam Switching (?)
|
Spectrometer (Autocorrelator) Notes Preferred: 1W2-001-800; 1W2-123-800; 1W2-245-800; 1W2-367-800
|
Technical Mode:Line Back end:ACR800 Back end Mode:1x2, multi-bank Procedures:DualBeamSwitch Receiver:K Switching Scheme:BeamSw
|
Proposal Information PI:Hughes Bands: K Back ends: S Support Person:
|
Checkout Notes Baseline shapes may be a problem. Single-bank mode would work but would require twice the telescope time.
|
Technical Mode:Line Back end:ACR200 Back end Mode:1x2, multi-bank. Procedures:DualBeamSwitch Receiver:K Switching Scheme:BeamSw
|
Proposal Information PI:Solomon Bands: K Back ends: S Support Person:
|
Checkout Notes Beam switching better than propossed Position Switching. 8 MHz lines and long integrations require good baselines. I'm assuming the 200 MHZ mode of ACR. ACR single-bank mode would double the needed telescope time.
|
Scheduling Notes pvdb availability:
October through November 9 is lost to travel. Not much planned after
that except a trip to New Mexico December 19-26 and a vacation January
2-21. Late November would be perfect!
|
Technical Mode:Line Back end:ACR800 Back end Mode:4x2, multi-bank Procedures:DualBeamSwitch Receiver:K Switching Scheme:BeamSw
|
Proposal Information PI:Benford Bands: K Back ends: SD Support Person:
|
Checkout Notes Very broad lines and long integrations will require good baselines. No idea why cross polarization is requested. Single-bank mode would require 4x the telescope time.
|
Technical Mode:Line Back end:S Back end Mode:2W2---800 two-bank Procedures:DualBeamSwitch Receiver:K Switching Scheme:BeamSw
|
Proposal Information PI:Greve Bands: K Back ends: S Support Person:
|
Checkout Notes Baselines and waiting on Beam Switching. Mult-bank
|
Technical Mode:Line Back end:S Back end Mode:Maybe 1W1-800 four-bank Procedures:Track Receiver:K Switching Scheme:Frequency
|
Proposal Information PI:Blain Bands: K Back ends: S Support Person:
|
Checkout Notes Frequency-switching doesn't seem right for the expected line widths. Maybe BeamSw better but 2x the time needed. Baseline issues.
|
Technical Mode:Line Back end:S Back end Mode: Procedures: Receiver:K Switching Scheme:Position
|
Proposal Information PI:Walter Bands: K Back ends: S Support Person: R. Maddalena
|
Technical Mode:Line Back end:S Back end Mode: Procedures: Receiver:K Switching Scheme:Position
|
Proposal Information PI:C. Brogan Bands: K Back ends: S Support Person:
|
Technical Mode:Line Back end:S Back end Mode: Procedures: Receiver:KQ Switching Scheme:Position
|
Proposal Information PI:Y. Shirley Bands: Q Back ends: S Support Person:
|
Technical Mode:Continuum Back end:D Back end Mode: Procedures: Receiver:K Switching Scheme:
|
Proposal Information PI:Myers Bands: K Back ends: D Support Person:
|